Weir dam output (Water Overlay): Difference between revisions

From Tygron Support wiki
Jump to navigation Jump to search
No edit summary
No edit summary
 
Line 18: Line 18:
* [[How to inspect breach output attributes of an overlay using the measurement tool]]
* [[How to inspect breach output attributes of an overlay using the measurement tool]]
* [[How to export an Object output attribute as measurement]]
* [[How to export an Object output attribute as measurement]]
|api=*[[Api session event editor overlay set key value]]
}}
}}


{{WaterOverlay hydraulic structure nav}}
{{WaterOverlay hydraulic structure nav}}
{{WaterOverlay output nav}}
{{WaterOverlay output nav}}

Latest revision as of 12:26, 13 July 2026

Notes

  • The Weir dam width and height are determined during rasterization phase.
  • This attribute does not need to be created when configuring the project. This attribute is created automatically by the Water Overlay when a calculation is performed.
  • To avoid conflicts, each Water Overlay appends its ID to the attribute name by default.

How-to's

API Endpoints