Order of calculations (Water Overlay): Difference between revisions

From Tygron Support wiki
Jump to navigation Jump to search
No edit summary
Tag: Reverted
No edit summary
Tag: Manual revert
 
Line 12: Line 12:
* [[Infiltration model (Water Overlay)#Ground infiltration|Ground infiltration]]
* [[Infiltration model (Water Overlay)#Ground infiltration|Ground infiltration]]
* [[Infiltration model (Water Overlay)#Surface infiltration|Surface infiltration]]
* [[Infiltration model (Water Overlay)#Surface infiltration|Surface infiltration]]
* [[Ground model (Water Overlay)#Seepage|Bottom flow]]
* [[Ground model (Water Overlay)#Seepage|Ground bottom flow]]
* [[Infiltration model (Water Overlay)#Exfiltration|Exfiltration]]
* [[Infiltration model (Water Overlay)#Exfiltration|Exfiltration]]
* Hydrological constructions ([[culvert (Water Overlay)|culvert]]s, [[weir (Water Overlay)|weir]]s, [[pump (Water Overlay)|pump]]s, [[inlet (Water Overlay)|in- and outlets]])
* Hydrological constructions ([[culvert (Water Overlay)|culvert]]s, [[weir (Water Overlay)|weir]]s, [[pump (Water Overlay)|pump]]s, [[inlet (Water Overlay)|in- and outlets]])

Latest revision as of 09:28, 7 May 2025

During the calculation, multiple facets have to be calculated. In each timestep, each aspect of the calculation has to be performed. Although as timesteps become smaller, the exact order of operation becomes less important, the order of operations can lead to specific behavioral details in some uncommon situations.

Calculations are performed in the following order: