Weir dam output (Water Overlay): Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
| Line 18: | Line 18: | ||
* [[How to inspect breach output attributes of an overlay using the measurement tool]] | * [[How to inspect breach output attributes of an overlay using the measurement tool]] | ||
* [[How to export an Object output attribute as measurement]] | * [[How to export an Object output attribute as measurement]] | ||
|api=*[[Api session event editor overlay set key value]] | |||
}} | }} | ||
{{WaterOverlay hydraulic structure nav}} | {{WaterOverlay hydraulic structure nav}} | ||
{{WaterOverlay output nav}} | {{WaterOverlay output nav}} | ||
Latest revision as of 12:26, 13 July 2026
| Icon | Key | Unit | Range | Description | Default value |
|---|---|---|---|---|---|
| WEIR_DAM_OUTPUT | m , m + datum | (0, -10000) to 10000 | An array of two values; the applied weir dam width and weir height | None |
Notes
- The Weir dam width and height are determined during rasterization phase.
- This attribute does not need to be created when configuring the project. This attribute is created automatically by the Water Overlay when a calculation is performed.
- To avoid conflicts, each Water Overlay appends its ID to the attribute name by default.
How-to's
- How to find the Object flow output attribute related to a specific Overlay
- How to inspect breach output attributes of an overlay using the measurement tool
- How to export an Object output attribute as measurement




