Weir height (Water Overlay): Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 13: | Line 13: | ||
|seealso= | |seealso= | ||
* [[Weir formula (Water Overlay)]]. | * [[Weir formula (Water Overlay)]]. | ||
* [[Weir height test case (Water Module)]] | |||
* [[How to import a time sequence with a CSV]] | * [[How to import a time sequence with a CSV]] | ||
|notes= | |notes= |
Revision as of 14:23, 17 January 2023
Icon | Key | Unit | Range | Description | Default value |
---|---|---|---|---|---|
WEIR_HEIGHT | m + datum | The height of the weir. Water can flow past the weir when the water level exceeds the weir's height. | n/a |
This attribute can be defined as values over time, using an array of values defining interpolation-time. This allows users to more dynamically define the height used to allow or deny water flowing across.
Notes
- When using a dynamic WEIR_HEIGHT, a maximum of 10.000 values (5.000 pairs) can be defined.
- When using a target upstream water level, the weir height can adjust automatically during simulation. This behavior can also be configured in combination with a dynamic weir height, but can lead to unexpected behavior. Instead for weirs with a target water level, define the weir height as a single start value.