Line 15: Line 15:
* <math>h_{x,y}</math> = [[Groundwater level formula (Water Overlay)|Ground water head]] in the grid cell.
* <math>h_{x,y}</math> = [[Groundwater level formula (Water Overlay)|Ground water head]] in the grid cell.
* <math>h_{d}(t)</math> = Additional ground water level (or head) of the external zone causing the seepage at time t, in meters
* <math>h_{d}(t)</math> = Additional ground water level (or head) of the external zone causing the seepage at time t, in meters
* <math>h_{c_{x,y}}</math> = Constant ground water level (or head) of the external zone causing the seepage, in meters
* <math>h_{c_{x,y}}</math> = [[Seepage GeoTiffs (Water Overlay)#Seepage p|Constant ground water level (or head) of the external zone]] causing the seepage, in meters
* <math>h_{v}(t)</math> = Additional variation of seepage head over time
* <math>h_{v}(t)</math> = [[Seepage fluctuation (Water Overlay)|Additional variation of seepage head]] over time
* <math>c_{x,y}</math> = Resistance of the separating layer in days
* <math>c_{x,y}</math> = [[Seepage GeoTiffs (Water Overlay)#Seepage c|Resistance of the separating layer]] in days
* <math>ws</math> = Water storage fraction of the soil
* <math>ws</math> = [[Terrain water storage percentage (Water Overlay)|Water storage fraction]] of the soil
* <math>\Delta w_{x,y}</math> = Seeped in water in m
* <math>\Delta w_{x,y}</math> = Seeped in water in m



Revision as of 11:53, 2 September 2020

Underground seepage from outside the project area is calculated per grid cell.

The water level change due to seepage is calculated using the following formula:

The external seepage head is variable over time by the introduction of hv,t:

Finally, the actual amount of water seeping into the ground from the bottom is calculated as followed:

Where:

Notes

  • and can both be provided as spatially variable values.
  • can be provided as a set of values, variable over time.
  • A seepage head lower than the water level in the project is also allowed, resulting in water seeping out to a region outside the project area.