Object entry correction (Water Overlay): Difference between revisions
Jump to navigation
Jump to search
No edit summary |
mNo edit summary |
||
| Line 4: | Line 4: | ||
|unit=boolean | |unit=boolean | ||
|description=Whether to move hydraulic constructions if they would otherwise be inactive due to overlap with another hydraulic construction. | |description=Whether to move hydraulic constructions if they would otherwise be inactive due to overlap with another hydraulic construction. | ||
}} | }}</onlyinclude>}} | ||
</onlyinclude>}} | |||
Objects (culverts, pumps, weirs) can sometimes overlap each other and then one or more objects become inactive. When this happens the rasterizer automatically moves the inactive object(s) start/end point(s) by a maximum of one cell so the object(s) become active. | Objects (culverts, pumps, weirs) can sometimes overlap each other and then one or more objects become inactive. When this happens the rasterizer automatically moves the inactive object(s) start/end point(s) by a maximum of one cell so the object(s) become active. | ||
Revision as of 09:51, 2 October 2020
| Icon | Attribute | Unit | Range | Description | Default value |
|---|---|---|---|---|---|
| OBJECT_CORRECTION | boolean | Whether to move hydraulic constructions if they would otherwise be inactive due to overlap with another hydraulic construction. | n/a |
Objects (culverts, pumps, weirs) can sometimes overlap each other and then one or more objects become inactive. When this happens the rasterizer automatically moves the inactive object(s) start/end point(s) by a maximum of one cell so the object(s) become active.
Notes
- This attribute is by default set to 1 which means object correction is applied.
- In the advanced settings step of the Water Overlay Wizard, this attribute can also be (de)activated.




