Impact flood threshold m (Water Overlay)

From Tygron Support wiki
Revision as of 11:30, 5 October 2022 by Maxim@tygron.com (talk | contribs)
Jump to navigation Jump to search

Water must reach this height either on one of the cells the Building is on, or on one of the cells adjacent to it. With the impact range m attribute the width of the water along the facade can be adjusted. This is used to compute the Impacted buildings result type.

Impacted buildings.jpg