Impact flood threshold m (Water Overlay): Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 7: | Line 7: | ||
}}</onlyinclude>}} | }}</onlyinclude>}} | ||
Water must reach this height either on one of the cells the construction is on, or on one of the cells adjacent to it. This is used to compute the [[Impacted buildings result type (Water Overlay)| | Water must reach this height either on one of the cells the construction is on, or on one of the cells adjacent to it. With the [[Impact_range_m_(Water_Overlay)|impact range m]] attribute the width of the water along the facade can be adjusted. This is used to compute the [[Impacted buildings result type (Water Overlay)|Impacted buildings]] result type. | ||
[[File:Impacted buildings.jpg]] | [[File:Impacted buildings.jpg]] | ||
Line 13: | Line 13: | ||
{{article end | {{article end | ||
|notes= | |notes= | ||
|seealso= | |||
* [[Impact_range_m_(Water_Overlay)|Impact range m attribute]] | |||
* [[Impacted buildings result type (Water Overlay)|Impacted buildings result type]] | |||
|howtos= | |howtos= |
Revision as of 08:22, 13 January 2021
Icon | Attribute | Unit | Range | Description | Default value |
---|---|---|---|---|---|
IMPACT_FLOOD_THRESHOLD_M | m | The amount of water a construction must experience before it is considered impacted by water. | n/a |
Water must reach this height either on one of the cells the construction is on, or on one of the cells adjacent to it. With the impact range m attribute the width of the water along the facade can be adjusted. This is used to compute the Impacted buildings result type.