Start date ms (Water Overlay)

From Tygron Support wiki
Revision as of 10:06, 29 January 2021 by Rudolf@tygron.nl (talk | contribs) (Created page with "{{Overlay attributes|<onlyinclude> {{Overlay attributes|type=row|overlay=Water |attribute=START_DATE_MS |unit=timestamp |description=The date and time which is considered the...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

For the purposes of relating a simulation to real-world events, a start date can be configured. This means the start of any time sequence and the start of the simulation displays a specific date and time. As the simulation progresses, the displayed date and time are furthered with the amount of time passed in the simulation.

Notes

  • The start of the simulation is for display purposes only. It does not affect the calculation itself, nor the interpretation of any time sequences.
  • This Attribute is configured automatically when loading in a rain sequence with times formatted as datetimes.
  • Time sequences such as RAIN_M are always interpreted as starting from 0 seconds, regardless of the configred START_DATE_MS.

How-to's