Shoreline (Water Overlay): Difference between revisions

From Tygron Support wiki
Jump to navigation Jump to search
mNo edit summary
No edit summary
Line 9: Line 9:


When a Waterway polygon is not correctly positioned in relation to the DEM this can result in filling up the nearby land with water at the start of the simulation. This will result in a lower water level then is expected from the water area value. To correct this, a "shoreline" is added at neighbouring cells. At the start of the simulation, these shoreline cells will also be filled with water up to the nearby water level to prevent the initial flush.
When a Waterway polygon is not correctly positioned in relation to the DEM this can result in filling up the nearby land with water at the start of the simulation. This will result in a lower water level then is expected from the water area value. To correct this, a "shoreline" is added at neighbouring cells. At the start of the simulation, these shoreline cells will also be filled with water up to the nearby water level to prevent the initial flush.
<gallery mode=nolines>
File:Wateroverlay_shoreline.png|Water Overlay with shoreline active.
File:Wateroverlay_without_shoreline.png|Water Overlay without shoreline active.
File:Wateroverlay_difference_waterlevel.png|Difference in [[Surface last value result type (Water Overlay)|water level]].
</gallery>


{{article end
{{article end

Revision as of 10:27, 29 January 2024

When a Waterway polygon is not correctly positioned in relation to the DEM this can result in filling up the nearby land with water at the start of the simulation. This will result in a lower water level then is expected from the water area value. To correct this, a "shoreline" is added at neighbouring cells. At the start of the simulation, these shoreline cells will also be filled with water up to the nearby water level to prevent the initial flush.

Notes

  • This option is active by default.

How-to's