Timeframes (Water Overlay): Difference between revisions

From Tygron Support wiki
Jump to navigation Jump to search
No edit summary
No edit summary
Line 9: Line 9:


==How-to's==
==How-to's==
* [[How-to add and remove an attribute|Add and remove an attribute]]
* [[How to add and remove an Attribute]]


{{WaterOverlay_model_attribute_nav}}
{{WaterOverlay_model_attribute_nav}}

Revision as of 12:20, 15 June 2020

Template:Overlay attribute

Notes

  • The total simulation time is divided by this value, and at each interval of that period of time a snapshot of the results so far is made. Note that the first timeframe does not contain the starting conditions of the simulation, but the state of the simulation after the first period of time has passed.
  • The amount of timeframes does not impact the calculation time or the simulation time.

How-to's