Start date ms (Water Overlay): Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 2: | Line 2: | ||
{{Overlay attributes|type=row|overlay=Water | {{Overlay attributes|type=row|overlay=Water | ||
|attribute=START_DATE_MS | |attribute=START_DATE_MS | ||
|unit= | |unit=long | ||
|description=The date and time which is considered the starting moment of the simulation. | |description=The date and time which is considered the starting moment of the simulation. | ||
|defaultvalue= | |defaultvalue=0 | ||
}}</onlyinclude>}} | }}</onlyinclude>}} | ||
Line 18: | Line 18: | ||
* [[How to add and remove an Attribute]] | * [[How to add and remove an Attribute]] | ||
|seealso= | |seealso= | ||
*[[Simulation time (Water Overlay)]] | |||
*[[Timeframe times (Water Overlay)]] | *[[Timeframe times (Water Overlay)]] | ||
}} | }} | ||
{{WaterOverlay model attribute nav}} | {{WaterOverlay model attribute nav}} |
Latest revision as of 14:36, 26 February 2024
Icon | Attribute | Unit | Range | Description | Default value |
---|---|---|---|---|---|
START_DATE_MS | long | The date and time which is considered the starting moment of the simulation. | 0 |
For the purposes of relating a simulation to real-world events, a start date can be configured. This means the start of any time sequence and the start of the simulation displays a specific date and time. As the simulation progresses, the displayed date and time are furthered with the amount of time passed in the simulation.
Notes
- The start of the simulation is for display purposes only. It does not affect the calculation itself, nor the interpretation of any time sequences.
- This Attribute is configured automatically when loading in a rain sequence with times formatted as datetimes.
- Time sequences such as RAIN_M are always interpreted as starting from 0 seconds, regardless of the configured START_DATE_MS.
- Technically, the default year is 1970. However, the year is not displayed.