Ground last value result type (Water Overlay): Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 15: | Line 15: | ||
* [[Underground model (Water Overlay)]] | * [[Underground model (Water Overlay)]] | ||
* [[Groundwater level formula (Water Overlay)]] | * [[Groundwater level formula (Water Overlay)]] | ||
* [[Underground infiltration formula (Water Overlay)]] | |||
* [[Underground evaporation formula (Water Overlay)]] | |||
}} | }} | ||
{{WaterOverlay result nav}} | {{WaterOverlay result nav}} |
Revision as of 11:01, 26 January 2024
Icon | Result type | Unit | Mode | Description |
---|---|---|---|---|
GROUND_LAST_VALUE | m (mm)¹ | Last | The distance between the terrain surface and the groundwater level. |
¹ the units between () are as displayed in the 3D client. If exported to GeoTiff the SI-convention is used: meters (m) and seconds (s).