|notes=* The unit is: the number of days it would take to equalize 1 meter of the local groundwater table level with the higher region's water head. (days)
|notes=* The unit is: the number of days it would take to equalize 1 meter of the local groundwater table level with the higher region's water head. (days)
* The values in this prequel grid are clamped between 0 and 1000000. No data values are therefore not allowed, but could be clamped to zero when negative leading to the same result.
* The values in this prequel grid are clamped between 0 and 1000000. NoData values are therefore not allowed, but could be clamped to zero when negative leading to the same result.
* This prequel can also have multiple input frames. In this case the values will be updated linear throughout the simulation period. For example 5 input frames over a 10 day simulation period result in a new value every two days.  
* This prequel can also have multiple input frames. In this case the values will be updated linearly throughout the simulation period. For example 5 input frames over a 10 day simulation period result in a new value every two days.  
* Note: Input frames are not linked to the overlay's output [[Timeframes_(Water_Overlay)|timeframes]].
* Note: Input frames are not linked to the overlay's output [[Timeframes_(Water_Overlay)|timeframes]].
|seealso=* [[Ground bottom flow formula (Water Overlay)]]
|seealso=* [[Ground bottom flow formula (Water Overlay)]]

Revision as of 14:58, 2 July 2026


Notes

  • The unit is: the number of days it would take to equalize 1 meter of the local groundwater table level with the higher region's water head. (days)
  • The values in this prequel grid are clamped between 0 and 1000000. NoData values are therefore not allowed, but could be clamped to zero when negative leading to the same result.
  • This prequel can also have multiple input frames. In this case the values will be updated linearly throughout the simulation period. For example 5 input frames over a 10 day simulation period result in a new value every two days.
  • Note: Input frames are not linked to the overlay's output timeframes.

See also