Bottom resistance prequel (Water Overlay): Difference between revisions

From Tygron Support wiki
Jump to navigation Jump to search
No edit summary
No edit summary
 
(12 intermediate revisions by 2 users not shown)
Line 1: Line 1:
{{Overlay prequels|overlay=Water|suppresscategory=true|allowselflinks=true|
{{Overlay prequels|overlay=Water|suppresscategory=true|allowselflinks=true|
<onlyinclude>{{Overlay prequels|type=row|overlay=Water
<onlyinclude>{{Overlay prequels|type=row|overlay=Water
   |prequel=SEEPAGE_RESISTANCE
   |prequel=BOTTOM_RESISTANCE
   |name=Seepage Resistance
   |name=Bottom Resistance
   |unit=days
   |unit=days
   |description=A grid of values containing the resistance of the lower layer against the seepage.
   |description=A grid of values containing the resistance of the lower layer against the bottom boundary flow.
   |min=0
   |min=0
   |max=1000000
   |max=1000000
Line 13: Line 13:
|notes=* The unit is: the number of days it would take to equalize 1 meter of the local groundwater table level with the higher region's water head. (days)
|notes=* The unit is: the number of days it would take to equalize 1 meter of the local groundwater table level with the higher region's water head. (days)
* The values in this prequel grid are clamped between 0 and 1000000. No data values are therefore not allowed, but could be clamped to zero when negative leading to the same result.
* The values in this prequel grid are clamped between 0 and 1000000. No data values are therefore not allowed, but could be clamped to zero when negative leading to the same result.
|seealso=* [[Underground seepage formula (Water Overlay)]]
* This prequel can also have multiple input frames. In this case the values will be updated linear throughout the simulation period. For example 5 input frames over a 10 day simulation period result in a new value every two days.
* [[Seepage fluctuation (Water Overlay)]]
* Note: Input frames are not linked to the overlay's output [[Timeframes_(Water_Overlay)|timeframes]].
|seealso=* [[Ground bottom flow formula (Water Overlay)]]
* [[Ground bottom pressure m (Water Overlay)]]
* [[Ground bottom flow result type (Water Overlay)]]
* [[Ground bottom flow result type (Water Overlay)]]
* [[Underground model (Water Overlay)]]}}
* [[Ground model (Water Overlay)]]}}


{{WaterOverlay simulation data nav}}
{{WaterOverlay simulation data nav}}

Latest revision as of 16:13, 26 January 2024


Notes

  • The unit is: the number of days it would take to equalize 1 meter of the local groundwater table level with the higher region's water head. (days)
  • The values in this prequel grid are clamped between 0 and 1000000. No data values are therefore not allowed, but could be clamped to zero when negative leading to the same result.
  • This prequel can also have multiple input frames. In this case the values will be updated linear throughout the simulation period. For example 5 input frames over a 10 day simulation period result in a new value every two days.
  • Note: Input frames are not linked to the overlay's output timeframes.

See also