Bottom resistance prequel (Water Overlay)

From Tygron Support wiki
Revision as of 15:10, 28 September 2023 by Frank@tygron.nl (talk | contribs) (Frank@tygron.nl moved page Seepage resistance prequel (Water Overlay) to Bottom resistance prequel (Water Overlay) without leaving a redirect)
Jump to navigation Jump to search


Notes

  • The unit is: the number of days it would take to equalize 1 meter of the local groundwater table level with the higher region's water head. (days)
  • The values in this prequel grid are clamped between 0 and 1000000. No data values are therefore not allowed, but could be clamped to zero when negative leading to the same result.

See also