Debug info (Water Overlay): Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
| Line 16: | Line 16: | ||
* Amount of flow over weirs | * Amount of flow over weirs | ||
* Amount of overflow from sewers | * Amount of overflow from sewers | ||
* Total [[Calculation time (Water Overlay)|calculation time]], and the amount of [[GPU]]'s used to perform the calculation | * Total [[Calculation time (Water Overlay)|calculation time]], and the amount of [[GPU Cluster|GPU]]'s used to perform the calculation | ||
* Total volume of water processed | * Total volume of water processed | ||
|} | |} | ||
{{WaterOverlay output nav}} | {{WaterOverlay output nav}} | ||
Latest revision as of 07:26, 3 July 2026

Editor → Current Situation (Ribbon tab) → Overlays (Ribbon bar) → The Water Overlay (Left panel) → General tab (Right panel) → Debug info
After the calculation completes, some additional information is tallied and output for debugging purposes. This is intended for verification that the model has computed as expected, and may provide some basic information at a glance. It is not meant as a primary tool for in-depth analysis of the results.
The following information is displayed:
| Debug info |
|---|
|




