Sewer level prequel (Water Overlay): Difference between revisions

From Tygron Support wiki
Jump to navigation Jump to search
Created page with "{{Overlay prequels|overlay=Water|allowselflinks=true| <onlyinclude>{{Overlay prequels|type=row|overlay=Water |prequel=SEWER_LEVEL |name=Sewer Level |unit=m |description=Initial filling of the sewer in M. |min=0 |max=10000 }}</onlyinclude>}} {{article end |notes= * Initial filling of the sewer in M. |seealso= * Surface model (Water Overlay) }} {{WaterOverlay simulation data nav}}"
 
No edit summary
 
(8 intermediate revisions by 2 users not shown)
Line 6: Line 6:
|description=Initial filling of the sewer in M.
|description=Initial filling of the sewer in M.
|min=0
|min=0
|max=10000
|max=Sewer Storage M
}}</onlyinclude>}}
}}</onlyinclude>}}
{{article end
{{article end
|notes=
|notes=
* Initial filling of the sewer in M.
* Initial filling of the sewer during e.g. [[Simulation_Core|iterations]] in M capped by the maximum amount of [[Sewer_storage_(Water_Overlay)|Storage]] possible.
|seealso=
|seealso=
* [[Surface model (Water Overlay)]]
* [[Surface model (Water Overlay)]]
|api=*[[Api session event editor overlay set prequel]]
}}
}}


{{WaterOverlay simulation data nav}}
{{WaterOverlay simulation data nav}}

Latest revision as of 09:48, 15 July 2026

Notes

  • Initial filling of the sewer during e.g. iterations in M capped by the maximum amount of Storage possible.

See also

API Endpoints