Min area (Watershed Overlay): Difference between revisions

From Tygron Support wiki
Jump to navigation Jump to search
No edit summary
No edit summary
 
Line 10: Line 10:
{{article end
{{article end
|notes=
|notes=
* Only waterways and bodies with the required minimum size can become an additional [[Discharge area (Watershed Overlay)|discharge areas]].
* Only waterways and bodies meeting the minimum size requirement can become additional [[Discharge area (Watershed Overlay)|discharge areas]].
* Water cells initialized to an additional discharge area can still be reassigned to a prioritized discharge area during the first propagation step of the watershed algorithm.
* Water cells initialized to an additional discharge area can still be reassigned to a prioritized discharge area during the first propagation step of the watershed algorithm.
|howtos=
|howtos=

Latest revision as of 13:29, 8 July 2026

Notes

  • Only waterways and bodies meeting the minimum size requirement can become additional discharge areas.
  • Water cells initialized to an additional discharge area can still be reassigned to a prioritized discharge area during the first propagation step of the watershed algorithm.

How-to's

API Endpoints