Active Stakeholder: Difference between revisions
No edit summary |
No edit summary |
||
(7 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
[[File:Editor_ribbon_bar_right_stakeholders.jpg|850px|thumb|left|The ribbon bar with all active Stakeholders, the currently selected Stakeholder: " | [[File:Editor_ribbon_bar_right_stakeholders.jpg|850px|thumb|left|The ribbon bar with all active Stakeholders, the currently selected Stakeholder: "Amsterdam" (Municipality), and another occupied stakeholder "Company".]]<br clear=all> | ||
On the far right hand side, the ribbon bar displays all [[Stakeholder | On the far right hand side, the ribbon bar displays all [[active Stakeholder]]s for the current project. The currently selected [[stakeholder]] is displayed with a blue background. An occupied stakeholder (selected by another user) is indicated with a gray background. Available stakeholders are displayed with a white background. This stakeholder becomes available for selection again when a user switches to a different [[stakeholder]], or logs out of the {{software}}. | ||
The stakeholder buttons enable users to switch between stakeholders by selecting the corresponding button. You can only switch to a [[stakeholder]] that is not yet selected by another user. | The stakeholder buttons enable users to switch between stakeholders by selecting the corresponding button. You can only switch to a [[stakeholder]] that is [[Stakeholder#Active vs. Inactive|active]] and not yet selected by another user. | ||
The stakeholder buttons are always visible, independently of the tab currently selected in the ribbon header. | The stakeholder buttons are always visible, independently of the tab currently selected in the ribbon header. | ||
<noinclude> | <noinclude> | ||
==Switching Stakeholder== | |||
{{:How to switch active stakeholder in the editor}} | |||
{{article end | {{article end | ||
|seealso= | |seealso= | ||
*[[Stakeholder]] | *[[Stakeholder]] | ||
|howtos= | |||
* [[How to switch active stakeholder in the editor]] | |||
}} | }} | ||
{{Template:Editor future design nav}} | {{Template:Editor future design nav}} | ||
</noinclude> | </noinclude> |
Latest revision as of 08:51, 1 February 2024
On the far right hand side, the ribbon bar displays all active Stakeholders for the current project. The currently selected stakeholder is displayed with a blue background. An occupied stakeholder (selected by another user) is indicated with a gray background. Available stakeholders are displayed with a white background. This stakeholder becomes available for selection again when a user switches to a different stakeholder, or logs out of the Tygron Platform.
The stakeholder buttons enable users to switch between stakeholders by selecting the corresponding button. You can only switch to a stakeholder that is active and not yet selected by another user.
The stakeholder buttons are always visible, independently of the tab currently selected in the ribbon header.
Switching Stakeholder
Switching a stakeholder is done by pressing an available stakeholder button (displayed with a white background). Keep in mind that, when switching a stakeholder you will also switch the indicators, budget and actions among others. You will make an identity switch!
- Hover over an available stakeholder in the ribbon bar.
- Select the hovered stakeholder.