How to adjust Demolition Costs
Jump to navigation
Jump to search
The Demolition cost of a Function can be adjusted in the Function Values Table. These costs are expressed as Currency x 1,000 per surface unit. Currency and measurement units depend on the selected localization of the project.
How to How to adjust Demolition Costs:
- Open Edit Function values
- Use the bottom scroll bar to navigate to the right
- Double-click the value to adjust the Demolition Cost