How to configure constant bottom boundary flow (Water Overlay)

From Tygron Support wiki
Revision as of 15:19, 28 September 2023 by Frank@tygron.nl (talk | contribs)
Jump to navigation Jump to search

When working with the full groundwater model of the Water Overlay, underground seepage may present a significant factor in the underground water balance. For these situations, underground seepage can be configured.

For seepage to be functional, the Bottom pressure prequel and Bottom resistance prequel are required and must be prepared beforehand.

Editor → Current Situation (Ribbon tab) → Overlays (Ribbon bar) → Water Overlay (Left panel) → Configuration Wizard (Right panel) → Seepage
How to configure constant seepage:
  1. Open the Water Overlay Wizard, and proceed to the seepage step.
  2. Opt to select seepage Grid Overlays and define the seepage factor.
  3. For the pressure Grid, import your GeoTIFF Overlay with seepage pressure values.
  4. Ensure the uploaded GeoTiff Overlay is selected in the dropdown.
  5. For the resistance Grid, import your GeoTIFF Overlay with seepage resistance values.
  6. Ensure the uploaded GeoTIFF Overlay is selected in the dropdown.
  7. Close the configuration wizard, and recalculate the Overlay.