How to configure the Water Overlays: Difference between revisions
Jump to navigation
Jump to search
(→Rain) |
|||
Line 25: | Line 25: | ||
==Water shortage== | ==Water shortage== | ||
These | These configurations can be implemented best using the [[Groundwater (Overlay)|Groundwater Overlay]]. | ||
* [[Drought_excessive_drain_use_case_(Water_Overlay)|Drought from excessive drains in the project area]] | * [[Drought_excessive_drain_use_case_(Water_Overlay)|Drought from excessive drains in the project area]] | ||
* [[Drought_excessive_evaporation_use_case_(Water_Overlay)|Drought from excessive evaporation in the project area]] | * [[Drought_excessive_evaporation_use_case_(Water_Overlay)|Drought from excessive evaporation in the project area]] |
Revision as of 09:10, 12 June 2019
Please note: This page is currently being updated.
This page describes how to realize specific configurations in different water overlays based on the water module.
Basics
- Create a basic water system
- Add groundwater to a basic water system
- Import waterdepth data
- Add sewer data
- Add subsidence calculation results to a water system's input
Excessive water
Flooding
These configurations can be implemented best using the Flooding Overlay.
- Visualize levee breach from water body inside project area (river, small lake)
- Visualize levee breach with water from outside the project area (large lake, sea)
- Visualize multiple sequential breaches
Rain
These configurations can be implemented best using the Rainfall Overlay.
Water shortage
These configurations can be implemented best using the Groundwater Overlay.
- Drought from excessive drains in the project area
- Drought from excessive evaporation in the project area