How to adjust Demolition Costs: Difference between revisions

From Tygron Support wiki
Jump to navigation Jump to search
No edit summary
No edit summary
Line 1: Line 1:
The [[Demolition cost (Category Value)|Demolition cost]] of a [[Function]] can be adjusted in the [[Function Values Table]]. These costs are expressed as Currency x 1,000 per surface unit. [[Currency]] and measurement units depend on the selected localization of the project.
The [[Demolition cost (Category Value)|Demolition cost]] of a [[Function]] can be adjusted in the [[Function Values Table]]. These costs are expressed as currency per m². [[Currency]] and measurement units depend on the selected localization of the project.
[[File:Demolition_Cost.JPG|350px|thumb|Adjusting Demolition Costs during a session]]
[[File:Demolition_Cost.JPG|350px|thumb|Adjusting Demolition Costs during a session]]
{{editor location|function values}}
{{editor location|function values}}

Revision as of 08:55, 15 October 2026

The Demolition cost of a Function can be adjusted in the Function Values Table. These costs are expressed as currency per m². Currency and measurement units depend on the selected localization of the project.

Adjusting Demolition Costs during a session
Editor → Current Situation (Ribbon tab) → Buildings (Ribbon bar) → Edit Function Values (Dropdown)
How to adjust Demolition Costs:
  1. Open Edit Function values
  2. Use the bottom scroll bar to navigate to the right
  3. Double-click the value to adjust the Demolition Cost