How to adjust Demolition Costs: Difference between revisions

From Tygron Support wiki
Jump to navigation Jump to search
No edit summary
No edit summary
Line 3: Line 3:
{{editor location|function values}}
{{editor location|function values}}


{{Editor steps|title=How to adjust Demolition Costs
{{Howto|title=adjust Demolition Costs
|Open Edit Function values
|Open Edit Function values
|Use the bottom scroll bar to navigate to the right
|Use the bottom scroll bar to navigate to the right

Revision as of 10:55, 13 October 2026

The Demolition cost of a Function can be adjusted in the Function Values Table. These costs are expressed as Currency x 1,000 per surface unit. Currency and measurement units depend on the selected localization of the project.

Adjusting Demolition Costs during a session
Editor → Current Situation (Ribbon tab) → Buildings (Ribbon bar) → Edit Function Values (Dropdown)
How to adjust Demolition Costs:
  1. Open Edit Function values
  2. Use the bottom scroll bar to navigate to the right
  3. Double-click the value to adjust the Demolition Cost