Net state: Difference between revisions

From Tygron Support wiki
Jump to navigation Jump to search
No edit summary
No edit summary
Line 8: Line 8:
|-
|-
| <code>NOTHING</code>
| <code>NOTHING</code>
| Default base state of the [[Net Load]]. Even though it can have a geometry, it is not considered to be placed in the [[Project Map]].
| Default base state of the [[Net Load]]. Even though it can have a geometry, it is not considered to be placed in the [[Project map]].
|-
|-
| <code>REQUEST_ZONING_APPROVAL</code>
| <code>REQUEST_ZONING_APPROVAL</code>
| Request is send to ask the [[Stakeholder Type#Net Owner|Net Owner]] for approval.
| Request is sent to ask the [[Stakeholder Type#Net Owner|Net Owner]] for approval.
|-
|-
| <code>REQUEST_CONSTRUCTION_APPROVAL</code>
| <code>REQUEST_CONSTRUCTION_APPROVAL</code>
| Request is send to ask owner of the [[Net Load]] for approval.
| Request is sent to ask owner of the [[Net Load]] for approval.
|-
|-
| <code>READY</code>
| <code>READY</code>

Revision as of 11:05, 6 July 2026

During a project session in the Tygron Platform, Net Load and Net Cluster states transform from one phase into another. For example: from being planned, to being permitted, to being ready.
The currently available net states are:

State Explanation
NOTHING Default base state of the Net Load. Even though it can have a geometry, it is not considered to be placed in the Project map.
REQUEST_ZONING_APPROVAL Request is sent to ask the Net Owner for approval.
REQUEST_CONSTRUCTION_APPROVAL Request is sent to ask owner of the Net Load for approval.
READY Building is done constructing.