The [[Demolition cost (Category Value)|Demolition cost]] of a [[Function]] can be adjusted in the [[Function Values Table]]. These costs are expressed as Currency x 1,000 per surface unit. [[Currency]] and measurement units depend on the selected localization of the project.
The [[Demolition cost (Category Value)|Demolition cost]] of a [[Function]] can be adjusted in the [[Function Values Table]]. These costs are expressed as currency per m<sup>2</sup>. [[Currency]] and measurement units depend on the selected localization of the project.
[[File:Demolition_Cost.JPG|350px|thumb|Adjusting Demolition Costs during a session]]
[[File:Demolition_Cost.JPG|350px|thumb|Adjusting Demolition Costs during a session]]
{{editor location|function values}}
{{editor location|function values}}


{{Editor steps|title=How to adjust Demolition Costs
{{Howto|title=adjust Demolition Costs
|Open Edit Function values
|Open Edit Function values
|Use the bottom scroll bar to navigate to the right
|Use the bottom scroll bar to navigate to the right

Latest revision as of 08:55, 15 October 2026

The Demolition cost of a Function can be adjusted in the Function Values Table. These costs are expressed as currency per m2. Currency and measurement units depend on the selected localization of the project.

Adjusting Demolition Costs during a session
Editor → Current Situation (Ribbon tab) → Buildings (Ribbon bar) → Edit Function Values (Dropdown)
How to adjust Demolition Costs:
  1. Open Edit Function values
  2. Use the bottom scroll bar to navigate to the right
  3. Double-click the value to adjust the Demolition Cost