How to adjust Demolition Costs: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
| (One intermediate revision by the same user not shown) | |||
| Line 1: | Line 1: | ||
The [[Demolition cost (Category Value)|Demolition cost]] can be adjusted in the [[Function | The [[Demolition cost (Category Value)|Demolition cost]] of a [[Function]] can be adjusted in the [[Function Values Table]]. These costs are displayed in an amount of money x 1,000/ surface unit. [[Currency]] and measurement units depend on the selected localization of the project. | ||
[[File:Demolition_Cost.JPG|350px|thumb|Adjusting Demolition Costs during a session]] | [[File:Demolition_Cost.JPG|350px|thumb|Adjusting Demolition Costs during a session]] | ||
{{editor location|function values}} | {{editor location|function values}} | ||
Latest revision as of 14:42, 12 May 2026
The Demolition cost of a Function can be adjusted in the Function Values Table. These costs are displayed in an amount of money x 1,000/ surface unit. Currency and measurement units depend on the selected localization of the project.
How to How to adjust Demolition Costs:
- Open Edit Function values
- Use the bottom scroll bar to navigate to the right
- By double-clicking on the value, the Demolition Cost can be adjusted