How to adjust Demolition Costs: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
| (2 intermediate revisions by the same user not shown) | |||
| Line 1: | Line 1: | ||
The [[Demolition cost (Category Value)|Demolition cost]] can be adjusted in the [[Function | The [[Demolition cost (Category Value)|Demolition cost]] of a [[Function]] can be adjusted in the [[Function Values Table]]. These costs are expressed as Currency x 1,000 per surface unit. [[Currency]] and measurement units depend on the selected localization of the project. | ||
[[File:Demolition_Cost.JPG|350px|thumb|Adjusting Demolition Costs during a session]] | [[File:Demolition_Cost.JPG|350px|thumb|Adjusting Demolition Costs during a session]] | ||
{{editor location|function values}} | {{editor location|function values}} | ||
| Line 6: | Line 6: | ||
|Open Edit Function values | |Open Edit Function values | ||
|Use the bottom scroll bar to navigate to the right | |Use the bottom scroll bar to navigate to the right | ||
| | |Double-click the value to adjust the Demolition Cost | ||
|}} | |}} | ||
| Line 12: | Line 12: | ||
|seealso= | |seealso= | ||
* [[Cost]] | * [[Cost]] | ||
|api=*[[Api session event editor functionoverride set category value]] | |||
*[[Api session event editor building set category value]] | |||
}} | }} | ||
[[Category:How-to's]] | [[Category:How-to's]] | ||
Latest revision as of 14:25, 14 July 2026
The Demolition cost of a Function can be adjusted in the Function Values Table. These costs are expressed as Currency x 1,000 per surface unit. Currency and measurement units depend on the selected localization of the project.
How to How to adjust Demolition Costs:
- Open Edit Function values
- Use the bottom scroll bar to navigate to the right
- Double-click the value to adjust the Demolition Cost