How to set dynamic breach height: Difference between revisions

From Tygron Support wiki
Jump to navigation Jump to search
No edit summary
Maxim@tygron.com (talk | contribs)
No edit summary
 
(3 intermediate revisions by one other user not shown)
Line 1: Line 1:
Breaches can be set to have a dynamic breach height, so that over time the [[elevation (Water Overlay)|terrain]] is heightened or lowered. This can allow a breach to appear or worsen at a later point during the simulated period. It can also allow a breach to be closed over time, or a levee breach to appear after a set period.
Breaches can be set to have a dynamic breach height, so that over time the [[elevation model (Water Overlay)|terrain]] is heightened or lowered. This can allow a breach to appear or worsen at a later point during the simulated period. It can also allow a breach to be closed over time, or a levee breach to appear after a set period.
See the [[Breach_height_(Water_Overlay)|breach height]] page for more information on how the breach is lowered to the provided values.
See the [[Breach_height_(Water_Overlay)|breach height]] page for more information on how the breach is lowered to the provided values.


Line 9: Line 9:
|Set the breach height's mode to dynamic, and select 'Select'. This will open the [[CSV importing tool]].
|Set the breach height's mode to dynamic, and select 'Select'. This will open the [[CSV importing tool]].
|Select 'Import new CSV', and select the CSV file with the desired timing data.
|Select 'Import new CSV', and select the CSV file with the desired timing data.
|Answers the questions related to your data format, so that the file can be interpreted correctly.
|Answer the questions about your data format to ensure the file is interpreted correctly.
|The imported values now appear in the CSV importing tool. The CSV importing tool can now be closed.
|The imported values now appear in the CSV importing tool. The CSV importing tool can now be closed.
|Continue with the configuration wizard of the Flooding Overlay.
|Continue with the configuration wizard of the Flooding Overlay.
Line 22: Line 22:
|notes=
|notes=
[[File:Breach_array.JPG|thumb|right|200px| Fill in the values for time and height in the breach height attribute.]]
[[File:Breach_array.JPG|thumb|right|200px| Fill in the values for time and height in the breach height attribute.]]
When preparing the [[CSV]] files for the breach, if the breach should be "open" from the beginning of the session, the first defined value for the breach height can immediately be a value low enough to allow water to flow in. If the breach should open up during the simulation but start "closed", the first defined value for the breach height should be equal to the [[elevation (Water Overlay)|terrain height]] in the breach's location.
For breaches open at the start, set the first CSV height value low enough to allow water flow. For breaches that open during simulation, set the initial height equal to the local terrain height.


A dynamic breach height can also be provided without a CSV. Therefore you can fill in the time and height values in the [[Breach height (Water Overlay)|breach height]] attribute of the [[Breach (Water Overlay)|breach]].  
Dynamic breach heights can also be set manually in the [[Breach (Water Overlay)|breach]]'s [[Breach height (Water Overlay)|breach height]] attribute.
See also the image below.
See also the image below.



Latest revision as of 11:10, 15 July 2026

Breaches can be set to have a dynamic breach height, so that over time the terrain is heightened or lowered. This can allow a breach to appear or worsen at a later point during the simulated period. It can also allow a breach to be closed over time, or a levee breach to appear after a set period. See the breach height page for more information on how the breach is lowered to the provided values.

Editor → Current Situation (Ribbon tab) → Overlays (Ribbon bar) → The Flooding Overlay (Left panel) → Configuration Wizard (Right panel)
How to set a dynamic breach height for an existing breach.:
  1. Prepare a CSV file with the desired timing data for the breach height.
  2. Open the configuration wizard of the Flooding Overlay and continue to the step concerning breaches.
  3. Set the breach height's mode to dynamic, and select 'Select'. This will open the CSV importing tool.
  4. Select 'Import new CSV', and select the CSV file with the desired timing data.
  5. Answer the questions about your data format to ensure the file is interpreted correctly.
  6. The imported values now appear in the CSV importing tool. The CSV importing tool can now be closed.
  7. Continue with the configuration wizard of the Flooding Overlay.

Notes

Fill in the values for time and height in the breach height attribute.

For breaches open at the start, set the first CSV height value low enough to allow water flow. For breaches that open during simulation, set the initial height equal to the local terrain height.

Dynamic breach heights can also be set manually in the breach's breach height attribute. See also the image below.

See also