How to adjust Demolition Costs: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
(3 intermediate revisions by 3 users not shown) | |||
Line 1: | Line 1: | ||
The [[Demolition cost (Function_Value)]] can be adjusted in the Function Value panel. These costs are displayed in an amount of money x 1,000/ surface unit. Currency and measurement units depend on the selected | The [[Demolition cost (Function_Value)]] can be adjusted in the Function Value panel. These costs are displayed in an amount of money x 1,000/ surface unit. [[Currency]] and measurement units depend on the selected localization of the project. | ||
[[File:Demolition_Cost.JPG|350px|thumb|Adjusting Demolition Costs during a session]] | [[File:Demolition_Cost.JPG|350px|thumb|Adjusting Demolition Costs during a session]] | ||
{{editor location|function values}} | {{editor location|function values}} | ||
Line 6: | Line 6: | ||
|Open Edit Function values | |Open Edit Function values | ||
|Use the bottom scroll bar to navigate to the right | |Use the bottom scroll bar to navigate to the right | ||
|By double clicking on the value the Demolition Cost can be adjusted | |By double-clicking on the value, the Demolition Cost can be adjusted | ||
|}} | |}} | ||
{{article end | |||
|seealso= | |||
* [[Cost]] | * [[Cost]] | ||
}} | |||
[[Category:How-to's]] |
Latest revision as of 13:20, 30 January 2024
The Demolition cost (Function_Value) can be adjusted in the Function Value panel. These costs are displayed in an amount of money x 1,000/ surface unit. Currency and measurement units depend on the selected localization of the project.
How to How to adjust Demolition Costs:
- Open Edit Function values
- Use the bottom scroll bar to navigate to the right
- By double-clicking on the value, the Demolition Cost can be adjusted