How to adjust Demolition Costs: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
| (9 intermediate revisions by 4 users not shown) | |||
| Line 1: | Line 1: | ||
The [[Demolition cost ( | The [[Demolition cost (Category Value)|Demolition cost]] of a [[Function]] can be adjusted in the [[Function Values Table]]. These costs are expressed as Currency x 1,000 per surface unit. [[Currency]] and measurement units depend on the selected localization of the project. | ||
[[File:Demolition_Cost.JPG|350px|thumb|Adjusting Demolition Costs during a session]] | |||
{{editor location|function values}} | {{editor location|function values}} | ||
{{Editor steps|title=How to adjust Demolition Costs | {{Editor steps|title=How to adjust Demolition Costs | ||
|Open Edit Function values | |Open Edit Function values | ||
|Use the bottom scroll bar to navigate to the right | |Use the bottom scroll bar to navigate to the right | ||
| | |Double-click the value to adjust the Demolition Cost | ||
|}} | |}} | ||
== | {{article end | ||
* [[How to | |seealso= | ||
* [[Cost]] | |||
|api=*[[Api session event editor functionoverride set category value]] | |||
*[[Api session event editor building set category value]] | |||
}} | |||
[[Category:How-to's]] | |||
Latest revision as of 14:25, 14 July 2026
The Demolition cost of a Function can be adjusted in the Function Values Table. These costs are expressed as Currency x 1,000 per surface unit. Currency and measurement units depend on the selected localization of the project.
How to How to adjust Demolition Costs:
- Open Edit Function values
- Use the bottom scroll bar to navigate to the right
- Double-click the value to adjust the Demolition Cost