How to model drainage (Water Overlay)

From Tygron Support wiki
Revision as of 12:28, 8 October 2026 by Frank@tygron.nl (talk | contribs)
Jump to navigation Jump to search

When using the Water Overlay to calculate groundwater, the presence of drainages can have a strong impact on the results. Drainages can be modeled using the drainage Building, and can be configured as either active drainages or passive drainages.

Drainages can be configured

Manually adding a drainage

Editor → Current Situation (Ribbon tab) → Buildings (Ribbon bar)
How to manually create drainages:
  1. Add a new underground Building to the Project.
  2. Set the Building's Function to either "Active Drainage" or "Passive Drainage".
  3. Draw the Building in the 3D Visualization in the location where the drainages are. Ensure the drainages are drawn only under solid land.
  4. Draw another polygon for the Building in the water where the drainage drains into (without removing the section drawn previously). Ensure it is not drawn over the water's edge.
  5. Open the Water Overlay's Water Overlay Wizard, and continue to the step concerning drainages.
  6. Configure the drainage's attributes as desired.

Preparing and importing drainage data

Editor → Current Situation (Ribbon tab) → Overlays (Ribbon bar) → your Water Overlay (Left panel) → Configuration Wizard (Right panel)
How to prepare and load in drainage data:
  1. Ensure that each drainage has at least 2 polygons: one drawn only under land, and one drawn only in the waterway it should drain into. Ensure no individual polygon overlays with both land and water, or the water's edge.
  2. Ensure all Attributes pertaining to drainages are configured correctly.
  3. Export the data as GeoJSON.
  4. Open the Water Overlay's Water Overlay Wizard, and continue to the step concerning drainages.
  5. Opt to import new data, and import your drainages file.

Notes

  • Drainages function across their entire polygon. In reality, drainages are discrete tubes; between them, water flows at normal underground speed. For maximum accuracy, model each tube as a separate polygon. However, drawing the drainage as one uninterrupted area still achieves the sped-up flow effect with minimal loss of detail.

See also

API Endpoints