Prequels (Subsidence Overlay): Difference between revisions

From Tygron Support wiki
Jump to navigation Jump to search
No edit summary
No edit summary
 
(6 intermediate revisions by 2 users not shown)
Line 1: Line 1:
Prequel overlays can be linked to the [[Subsidence Overlay]] to initiate particular parts of the model with more accuracy and detail.
Prequel overlays can be linked to the [[Subsidence Overlay]] to initiate particular parts of the model with more accuracy and detail.


{| {{STDT|overlay sortable}}
{{Overlay prequels|suppresscategory=true|allowselflinks=true|
|-
{{:High ground water prequel (Subsidence Overlay)}}
! style=text-align:left; | Name
{{:Low ground water prequel (Subsidence Overlay)}}
! style=text-align:left; | Underlying data
{{:Clay thickness prequel (Subsidence Overlay)}}
! style=text-align:left; | Description
}}
|-
| [[High ground water (Heat Overlay)|High ground water level]]
| [[Prequel (Subsidence Overlay)|Subsidence Prequel]]
| Grid based high ground water levels
|-
| [[Low ground water (Heat Overlay)|Low ground water level]]
| [[Prequel (Subsidence Overlay)|Subsidence Prequel]]
| Grid based low ground water levels
|}


{{SubsidenceOverlay raster nav}}
{{SubsidenceOverlay raster nav}}

Latest revision as of 08:21, 11 February 2022

Prequel overlays can be linked to the Subsidence Overlay to initiate particular parts of the model with more accuracy and detail.