How to adjust Demolition Costs

From Tygron Support wiki
Jump to navigation Jump to search

The Demolition cost can be adjusted in the Function Values Table. These costs are displayed in an amount of money x 1,000/ surface unit. Currency and measurement units depend on the selected localization of the project.

Adjusting Demolition Costs during a session
Editor → Current Situation (Ribbon tab) → Buildings (Ribbon bar) → Edit Function Values (Dropdown)
How to How to adjust Demolition Costs:
  1. Open Edit Function values
  2. Use the bottom scroll bar to navigate to the right
  3. By double-clicking on the value, the Demolition Cost can be adjusted

See also