How to adjust Demolition Costs
Revision as of 08:59, 22 September 2020 by Reijn@tygron.com (talk | contribs)
The Demolition cost (Function_Value) can be adjusted in the Function Value panel. These costs are displayed in an amount of money x 1,000/ surface unit. Currency and measurement units depend on the selected region (localization) of the project.
How to How to adjust Demolition Costs:
- Open Edit Function values
- Use the bottom scroll bar to navigate to the right
- By double clicking on the value the Demolition Cost can be adjusted