Freatic groundwater levels benchmark (Water Module): Difference between revisions
No edit summary |
No edit summary |
||
| Line 4: | Line 4: | ||
===Formulas=== | ===Formulas=== | ||
Due to continuous rainfall and two stable water levels left and right, a specific ground water table curve will form. | Due to continuous rainfall and two stable water levels left and right, a specific ground water table curve will form. Rainwater flows both left and right. | ||
Note that the time at which this balance occurs is dependent on the starting situation. | Note that the time at which this balance occurs is dependent on the starting situation. | ||
| Line 22: | Line 22: | ||
The following setup has been taken from the use case ''Peilverschil over een strook grond (freatisch)'' at [http://grondwaterformules.nl/index.php/formules/peilverschil/rechte-strook-freatisch grondwaterformules.nl]. | The following setup has been taken from the use case ''Peilverschil over een strook grond (freatisch)'' at [http://grondwaterformules.nl/index.php/formules/peilverschil/rechte-strook-freatisch grondwaterformules.nl]. | ||
In the situation described there, the chosen Length L is set to 500 m. This is achieved with a grid size of 28 by 5, with a cell size of 20 m. | In the situation described there, the chosen Length L is set to 500 m. This is achieved with a grid size of 28 by 5, with a cell size of 20 m. Two stable groundwater levels are used: 11m (datum) on the left and 10m on the right. The rainfall is 0.8 mm per day, the horizontal infiltration speed is 3 m per day. | ||
| Line 29: | Line 29: | ||
The terrain type's [[Ground infiltration md (Water Overlay)|infiltration speed]] can be configured to 3 m / day. | The terrain type's [[Ground infiltration md (Water Overlay)|infiltration speed]] can be configured to 3 m / day. | ||
For x = 1 the initial ground water level is set to 11 and for x = 26 the ground water level is set to 10. | For x = 1 the initial ground water level is set to 11 and for x = 26 the ground water level is set to 10. Initial groundwater levels between these points are linearly interpolated. | ||
Additionally, two [[Inlet (Water Overlay)|underground inlets]] are placed, one on x=1 and one on x=26, as an area over y = 1 to 3. | Additionally, two [[Inlet (Water Overlay)|underground inlets]] are placed, one on x=1 and one on x=26, as an area over y = 1 to 3. | ||
The simulation time is set to n days, with a rainfall of 0.8 mm per day. | The simulation time is set to n days, with a rainfall of 0.8 mm per day. Configure the [[Weather rain m (Water Overlay)|rain]] as: <math>[3600 \cdot 24 \cdot n, \frac{0.8}{1000 \cdot 3600 \cdot 24}]</math>. | ||
===Results=== | ===Results=== | ||
Latest revision as of 08:11, 8 July 2026
This benchmark demonstrates a situation where a parcel of land is situated between two waterways, each with a stable but different water level. In combination with continuous rainfall, a characteristic curve will form over time, as shown in the image below.
Formulas
Due to continuous rainfall and two stable water levels left and right, a specific ground water table curve will form. Rainwater flows both left and right. Note that the time at which this balance occurs is dependent on the starting situation.
The following formula, taken from literature[1], describes the curve of ground water levels when the ground water flow to the left and right have become stable:
where:
- : distance of the left waterway edge (m)
- : water level at x = 0 (m)
- : water level at x = L (m)
- : distance between both waterways (m)
- : horizontal infiltration speed (m / day)
- : additional ground water (m/day).
Setup
The following setup has been taken from the use case Peilverschil over een strook grond (freatisch) at grondwaterformules.nl.
In the situation described there, the chosen Length L is set to 500 m. This is achieved with a grid size of 28 by 5, with a cell size of 20 m. Two stable groundwater levels are used: 11m (datum) on the left and 10m on the right. The rainfall is 0.8 mm per day, the horizontal infiltration speed is 3 m per day.
The terrain height is set to 12 for all cells and the ground bottom distance is also set to 12.
The terrain type's infiltration speed can be configured to 3 m / day.
For x = 1 the initial ground water level is set to 11 and for x = 26 the ground water level is set to 10. Initial groundwater levels between these points are linearly interpolated.
Additionally, two underground inlets are placed, one on x=1 and one on x=26, as an area over y = 1 to 3.
The simulation time is set to n days, with a rainfall of 0.8 mm per day. Configure the rain as: .
Results
365 days
The first result is generated for n = 365:
730 days
The second result is generated using n = 730:
Notes
- The amount of days it takes to reach the stable solution is highly dependent on the starting situation.
References
- ↑ Hydraulics of Groundwater. McGraw-Hill. ∙ Bear, J., 1979. ∙ Page(s): 180, equation 5-212





