Prequels (Traffic NO2 Overlay): Difference between revisions

From Tygron Support wiki
Jump to navigation Jump to search
No edit summary
Tag: Reverted
No edit summary
Tag: Manual revert
 
(One intermediate revision by the same user not shown)
(No difference)

Latest revision as of 12:43, 9 June 2026

Prequel overlays can be linked to the Traffic NO2 Overlay to base traffic intensities for calculations on, rather than basing it on roads and their Attributes in the project.


Notes

  • A Prequel with a single timeframe will mean that value applies to all hours of the day. A Prequel with multiple timeframes is assumed to have 24 timeframes, with each timeframe representing a single hour of the day.
  • In case a prequel is selected for a particular traffic type, the jam factor is still obtained from the existing roads, just as when no prequel is provided. The prequel only provides an alternative value for the number of traffic for that traffic type.