How to change Measures activated by a Scenario
Jump to navigation
Jump to search

Measures can be automatically planned when a scenario is activated. For example, stakeholders might explore various spatial alignments in one scenario or apply a specific measure in another to narrow down options for discussion. Ensure the measures are available, then select 'Measures' from the left panel. Available measures appear in the right panel and can be assigned to the selected scenario.
How to add measures to a scenario:
- Ensure predefined measures are available in the project
- Select Multi-Scenario → Scenarios
- Select the scenario to have measures added to
- Select on the left panel the Measures property from the selected scenario
- Mark the check box of the desired measure from the available entries on the right panel