Subsidence result type (Subsidence Overlay)

From Tygron Support wiki
Revision as of 13:42, 29 October 2020 by Rudolf@tygron.nl (talk | contribs)
Jump to navigation Jump to search

Notes

The result is the difference between the initial terrain height (including the effects of [Action]]s taken during a session which may change the height of the terrain), and the terrain height after the configured amount of years of subsidence.