Subsidence result type (Subsidence Overlay): Difference between revisions
Jump to navigation
Jump to search
mNo edit summary |
No edit summary |
||
(One intermediate revision by one other user not shown) | |||
Line 7: | Line 7: | ||
|description=The amount that the ground has lowered as a result of subsidence, both oxidation and compaction. | |description=The amount that the ground has lowered as a result of subsidence, both oxidation and compaction. | ||
}}</onlyinclude>}} | }}</onlyinclude>}} | ||
{{article end | |||
|notes=The result is the difference between the initial terrain height (including the effects of [Action]]s taken during a session which may change the height of the terrain), and the terrain height after the configured amount of years of subsidence. | |||
|seealso= | |||
* [[Subsidence formula (Subsidence Overlay)|Subsidence formula]] | |||
}} | |||
{{SubsidenceOverlay result nav}} | {{SubsidenceOverlay result nav}} |
Latest revision as of 12:38, 16 February 2021
Icon | Result type | Unit | Mode | Description |
---|---|---|---|---|
SUBSIDENCE | m | Total | The amount that the ground has lowered as a result of subsidence, both oxidation and compaction. |
Notes
The result is the difference between the initial terrain height (including the effects of [Action]]s taken during a session which may change the height of the terrain), and the terrain height after the configured amount of years of subsidence.
See also