Settlement result type (Subsidence Overlay): Difference between revisions
Jump to navigation
Jump to search
mNo edit summary |
No edit summary |
||
(3 intermediate revisions by one other user not shown) | |||
Line 1: | Line 1: | ||
{| | {{result types|<onlyinclude> | ||
{{result types|type=row|overlay=Subsidence | |||
|name=SETTLEMENT | |||
|icon=overlay_icon_subsidence_settlement.png | |||
|unit=m | |||
| | |mode=Total | ||
| | |description=The amount that the ground has lowered as a result of compaction. | ||
| | }}</onlyinclude>}} | ||
| | |||
|The amount that the ground has lowered as a result of compaction. | |||
{{ | {{article end | ||
|notes=The result is the difference between the initial terrain height (including the effects of [[Action]]s taken during a session which may change the height of the terrain), and the terrain height after the configured amount of years of subsidence. | |||
|seealso= | |||
* [[Compaction formula (Subsidence Overlay)|Compaction formula]] | |||
}} | |||
{{SubsidenceOverlay result nav}} |
Latest revision as of 12:34, 16 February 2021
Icon | Result type | Unit | Mode | Description |
---|---|---|---|---|
SETTLEMENT | m | Total | The amount that the ground has lowered as a result of compaction. |
Notes
The result is the difference between the initial terrain height (including the effects of Actions taken during a session which may change the height of the terrain), and the terrain height after the configured amount of years of subsidence.
See also