How to correct a building in an uninterrupted waterway: Revision history

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

30 January 2024

5 October 2022

  • curprev 09:4009:40, 5 October 2022Maxim@tygron.com talk contribs 3,965 bytes +3,965 Created page with "The Water Overlay models a number of constructions as line-based buildings, which allow water to flow through the structure from one endpoint to the other. However, some constructions also naturally inhibit water flowing past them in an otherwise uninterrupted waterway. Foe example, a weir is effectively a small dam in a waterway. In source data, these kinds of constructions may be location in an otherwise uninterrupted wat..."