How to configure the Water Overlays

From Tygron Support wiki
Jump to navigation Jump to search
Please note: This page is currently being updated.

This page describes several use cases and examples of configurations in the Flooding Overlay.

Time-controlled flow rate in Breach

To create a variable Outlet Q in a breach area, a CSV file can be imported. Below the steps on how to create such a breach area:

How to How to create a time-controlled flow rate in a Breach:
  1. Either add a breach area or have your GeoJSON file with your breach area ready. The area should have at least a breach_floor attribute;
  2. Add a Flooding_(Overlay);
  3. Go to the Configuration Wizard of the Flooding Overlay;
  4. In step 2.1 either select the attribute that specifies your breach_floor or import your GeoJSON file;
  5. Click on Next;
  6. In the dropdown menu, select your breach area. Now click on Add;
  7. Import your CSV file;
  8. Select your time units;
  9. Click on Apply;

Multi Breach Simulation

Show a simulation of a dike breach

Create an in- and outlet