How to adjust the starting budget of a Stakeholder

From Tygron Support wiki
Revision as of 13:22, 30 January 2024 by Frank@tygron.nl (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Changing the budget of a stakeholder

The Budget a stakeholder has during a session can be adjusted for each stakeholder via the Stakeholder ribbon. When selecting a stakeholder, the start budget is visible in the right panel of the Tygron Platform. By default, the start budget of a stakeholder is '0', although this can be adjusted to a desired amount.

Editor → Multi Scenario (Ribbon tab) → Stakeholders (Ribbon bar)
How to adjust the starting budget:
  1. Click on Stakeholders.
  2. Click on the desired Stakeholder in the left panel.
  3. Adjust the Start Budget on the right side of the Tygron Platform to the desired amount.