How to add Financial Actions to your project

From Tygron Support wiki
Revision as of 11:23, 4 November 2020 by Reijn@tygron.com (talk | contribs) (Created page with "The access of a stakeholder to Financial possibilities during a session is determined with the assignment of "Financial Actions". There are four types of financial actions, Fi...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

The access of a stakeholder to Financial possibilities during a session is determined with the assignment of "Financial Actions". There are four types of financial actions, Finance view, Transfer money, Request subsidy and Bank Loans.

File:Finance Actions.JPG
Adjusting the Finance Actions of a Stakeholder
Editor → Future Design (Ribbon tab) → Actions (Ribbon bar) → The Action Menu to edit (Left panel) → Actions tab (Right panel)
How to adjust the starting budget:
  1. Click on the desired Stakeholder in the top bar of FUTURE DESIGN.
  2. Select Finance in the Action Menus on the left side panel.
  3. Select the Actions Ribbon on the right side panel and open the Special Options drop down menu.
  4. Select Finance
  5. Select the desired Finance actions for the Stakeholder