How to adjust the starting budget of a Stakeholder

From Tygron Support wiki
Revision as of 09:43, 23 September 2020 by Reijn@tygron.com (talk | contribs) (Created page with "right|thumb|150px|Changing the budget of a stakeholder The budget a stakeholder has during a session can be adjusted for each level via the Stakehol...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Changing the budget of a stakeholder

The budget a stakeholder has during a session can be adjusted for each level via the Stakeholder ribbon. When clicking on a stakeholder, the start budget is visible in the right bar of the Tygron Platform. By default, the start budget of a stakeholder is '0', although this can be adjusted to a desired amount. It is also possible by selecting a level in the stakeholder menu to use an Additional Budget in the same bar on the right side. This additional budget will be added up by the Start Budget at the beginning of a level.

Editor → Multi Scenario (Ribbon tab) → Stakeholders (Ribbon bar)
How to adjust the starting budget:
  1. Click on Stakeholders.
  2. Click on the desired Stakeholder in the left sided bar.
  3. Adjust the Start Budget on the right side to the desired amount.