How to adjust Buyout costs: Difference between revisions

From Tygron Support wiki
Jump to navigation Jump to search
No edit summary
No edit summary
Line 6: Line 6:
|Open Edit Function values
|Open Edit Function values
|Use the bottom scroll bar to navigate to the right
|Use the bottom scroll bar to navigate to the right
|By double clicking on the value the Buyout Cost can be adjusted
|By double-clicking on the value the Buyout Cost can be adjusted
|}}
|}}
==See also==
* [[How to adjust ]]

Revision as of 09:31, 22 September 2020

The Buy Out fee are the costs involved with the relocation of inhabitants, when demolishing a structure that is not vacant. These costs can have a high impact on planned projects. Adjusting these costs can be done in the Function Value panel for each structure in the project area.

Adjusting Demolition Costs during a session
Editor → Current Situation (Ribbon tab) → Buildings (Ribbon bar) → Edit Function Values (Dropdown)
How to How to adjust Demolition Costs:
  1. Open Edit Function values
  2. Use the bottom scroll bar to navigate to the right
  3. By double-clicking on the value the Buyout Cost can be adjusted