Multi Scenario: Difference between revisions
Jump to navigation
Jump to search
| Line 10: | Line 10: | ||
A Test run always starts a Scenario. You can use the Scenario Choice box to adjust which Scenario is activated. | A Test run always starts a Scenario. You can use the Scenario Choice box to adjust which Scenario is activated. | ||
{{Editor multi scenario nav}} | {{Editor multi scenario nav}} | ||
Revision as of 07:30, 8 June 2026
The Multi Scenario tab is the third of the four ribbon tabs and is located in the top part of the editor. The Multi Scenario tab contains the options to design multi-scenario analyses. This consists of managing stakeholders and configuring scenarios.

Test run
A Test Run can be started by clicking on the play button. The Scenario seen in this bar indicates the scenario that will be selected when activating a Test Run.

Switch Scenario
A Test run always starts a Scenario. You can use the Scenario Choice box to adjust which Scenario is activated.