Net state: Difference between revisions
Jump to navigation
Jump to search
Created page with "During a project session in the {{software}}, net load (and net cluster) states transform from one phase into another. For example; from being planned, to being permitted, to being ready. <br> The currently available net states are: {| class="wikitable" |- ! State ! Explanation |- | <code>NOTHING</code> | Default base state of the Net Load. Even though it can have a geometry, it is not considered to be placed in the project area. |- | <code>REQUEST_ZONING..." |
No edit summary |
||
| Line 11: | Line 11: | ||
|- | |- | ||
| <code>REQUEST_ZONING_APPROVAL</code> | | <code>REQUEST_ZONING_APPROVAL</code> | ||
| Request is send to ask the [[net owner]] for approval. | | Request is send to ask the [[Stakeholder Type#Net Owner|net owner]] for approval. | ||
|- | |- | ||
| <code>REQUEST_CONSTRUCTION_APPROVAL</code> | | <code>REQUEST_CONSTRUCTION_APPROVAL</code> | ||
Latest revision as of 13:50, 5 March 2026
During a project session in the Tygron Platform, net load (and net cluster) states transform from one phase into another. For example; from being planned, to being permitted, to being ready.
The currently available net states are:
| State | Explanation |
|---|---|
NOTHING
|
Default base state of the Net Load. Even though it can have a geometry, it is not considered to be placed in the project area. |
REQUEST_ZONING_APPROVAL
|
Request is send to ask the net owner for approval. |
REQUEST_CONSTRUCTION_APPROVAL
|
Request is send to ask owner of the net load for approval. |
READY
|
Building is done constructing. |