Multi Scenario: Difference between revisions

From Tygron Support wiki
Jump to navigation Jump to search
No edit summary
Line 6: Line 6:
A [[Test Run]] can be started by clicking on the ''play'' button. The [[Scenario]] seen in this bar indicates the scenario that will be selected when activating a Test Run.
A [[Test Run]] can be started by clicking on the ''play'' button. The [[Scenario]] seen in this bar indicates the scenario that will be selected when activating a Test Run.
[[File:Editor_ribbon_header_multiscenario.png|850px|thumb|left|]]<br clear=all>
[[File:Editor_ribbon_header_multiscenario.png|850px|thumb|left|]]<br clear=all>
<gallery>
File:Api_multi_scenario.png|thumb|400px|[[Stakeholder]]s, [[Scenario]]s, [[Popup]]s, [[Zoom Level]]s, [[Time]]s
</gallery>
{{Editor multi scenario nav}}
{{Editor multi scenario nav}}

Revision as of 09:22, 26 October 2022

The Multi stakeholder tab is the third of the four ribbon tabs and is located in the top part of the editor. The Multi Stakeholder tab contains the options to design multi-scenario analyses. This consists of managing stakeholders and configuring scenarios.

The editor. The Multi scenarios tab is located in the ribbon bar at the top of the editor.


Multi Scenario

A Test Run can be started by clicking on the play button. The Scenario seen in this bar indicates the scenario that will be selected when activating a Test Run.

Editor ribbon header multiscenario.png